Foundation/Framing
Small House Solutions began the Matt Emmert project at 715 Harris Ave with careful foundation and framing work, setting the structure in place with strength, accuracy, and attention to detail. From preparing the early groundwork to building the framework, their team created a solid and dependable base for the home to move forward smoothly.
no images were found
Sheetrock
Small House Solutions continued the project with detailed sheetrock installation, helping transform the framed structure into defined and functional interior spaces. Their team carefully prepared the walls and ceilings, creating a clean and smooth surface for the finish work that would follow.
Finishes in Progress
Small House Solutions brought the home closer to completion through thoughtful finish work, coordinating surfaces, materials, and interior details with care. With attention to both style and function, their craftsmen worked carefully to improve each space and bring the client’s vision closer to a polished final result.
no images were found
Finishes
For the Matt Emmert – 715 Harris Ave project, Small House Solutions helped bring the home closer to completion through carefully coordinated finish work. Their team focused on the details that give each space a clean, finished appearance, including interior surfaces, trim, materials, and final design elements.
With attention to both craftsmanship and functionality, Small House Solutions worked to ensure the finishes complemented the overall style of the home while supporting everyday use.

