ADU Feasibility Reports: Deliverables to Review Before Design
An ADU feasibility report should explain the findings, open questions, and next decisions for one property. Review the evidence behind a go, revise, or stop recommendation before paying for the next design stage.
Establish the site information needed before fixing the building position.
Start with the address, survey, property records, and intended use.
Identify trees, easements, drainage, setbacks, and service routes on a site plan.
Separate preliminary findings from items that require city or utility confirmation.
Require a decision, not a generic checklist
The study should identify the parcel and jurisdiction, list documents reviewed, draw a preliminary building envelope, and state unresolved questions. Trees, easements, drainage, utility routes, and construction access need to appear on the same site sketch. Distinguish a preliminary screen from survey, engineering, utility approval, or a permit decision. Each uncertainty should name who will confirm it and the decision it may change.
Describe the intended resident and daily use. An independent home for a family member, a rental dwelling, and a work building are not interchangeable briefs. Include any likely future change that should influence the first review. A useful feasibility scope connects those needs to a particular property and proposed pathway, rather than delivering a generic list of ADU considerations that never states what they mean for your site.
Discuss the household brief and unresolved scope before committing to construction.
Translate findings into the next investment
A constrained rear yard may favor an attached unit or smaller one-story plan; a difficult utility route may change placement before room design begins. Ask for options with reasons, not only one favored footprint. In Austin, the ADU and HOME pathways must be distinguished; in San Antonio, use the city’s ADU requirements rather than transferring Austin assumptions.
A report can support a revised project as well as the first idea. For example, compare a preferred rear-yard position with a smaller footprint that preserves a service route. The findings should explain which constraint changes and what benefit is lost, such as a separate work room. A recommendation to revise is useful when it identifies a workable tradeoff; a different sketch with the same unresolved controlling constraint has not advanced the decision.
Review the room layout and exterior elevations together.
A useful feasibility deliverable
| Output | What it shows | Next decision |
|---|---|---|
| Rules summary | Applicable pathway and parcel questions | Which authority must confirm |
| Site envelope | Constraints and access on a survey | Where and how large |
| Budget risks | Utility, structure, and site unknowns | Whether to commission design |
Which feasibility finding controls the next decision
Feasibility questions do not all have the same consequence. An uncertain building location can change the whole floor plan; an unresolved finish selection usually cannot establish whether the dwelling fits on the parcel. The investigation is most useful when it distinguishes a controlling constraint from a later design choice.
Some findings interact. Moving the building to avoid one constraint may lengthen a service route or reduce privacy between homes. A sketch showing only a permitted-looking outline misses that interaction. The study needs enough site context to explain why its preferred position is more workable than another position, including which assumptions remain unconfirmed.
A useful conclusion links evidence to an action. A promising concept can proceed with named questions still open. Another concept may need a targeted service investigation before detailed drawings are worthwhile. A negative conclusion should identify the obstacle and whether it applies to the whole household goal or only to the proposed arrangement. These distinctions make a feasibility study more informative than a checklist of possible problems. They also prevent a preliminary screen from becoming an unsupported promise about final area, price, technical compliance, or approval.
Use a constraint to decide whether to move the concept
Consider a hypothetical site where an attractive rear building position conflicts with the proposed route for services. The feasibility report should compare keeping the location, shifting the footprint, and investigating another service approach. It should not label the site simply feasible while leaving the controlling conflict unexplained.
For each option, note what is known, what must be confirmed, and which intended function changes. Moving the dwelling might improve the service route but reduce outdoor privacy. Keeping the location might preserve the garden while requiring further provider or technical review. Those are different decisions, even when both sketches show the same floor area.
Ask for a preferred next action and the reason for it. The action might be a targeted investigation rather than detailed design. Identify the finding that would cause the concept to change or stop. This makes the report useful to an owner deciding where to spend the next design dollar. A carefully bounded unresolved conclusion is more actionable than a confident green light unsupported by parcel-specific evidence.
Include wiring routes and electrical work in the project scope.
Related planning decisions
Homeowner questions
Is feasibility the same as permit approval?
No. Feasibility is an early investigation. Final drawings, engineering, utility decisions, review comments, and inspections can still change the approved scope.
Should I order a survey before the feasibility conversation?
Ask which existing survey or parcel information can support the initial screen and what a current survey must resolve. The required detail depends on the question being investigated. Do not substitute an informal online parcel outline for information needed to establish a design boundary.
Can a feasibility report be reused for a different ADU design?
Some property findings may remain relevant, but a changed use, footprint, unit count, or service strategy can change the analysis. Have the team identify which conclusions still apply and what must be revisited. Preserve the original scope and date in the record.