Small House Solutions l Design-Build in Texas
  • Home
  • ADUs
    • ADU Feasibility
    • ADU Cost
    • ADU Utilities
    • ADU Projects
    • Austin ADU Regulations
    • Permit Process
    • Our ADU Process
  • LOCATIONS
    • Bastrop County
    • Bell County
      • Copperas Cove
      • Harker Heights
      • Killeen
    • Bexar County
      • Cibolo
      • Converse
      • Leon Valley
      • Live Oak
      • San Antonio
      • Schertz
      • Universal City
    • Blanco County
    • Burnet County
      • Marble Falls
    • Caldwell County
      • Lockhart
    • Comal County
      • New Braunfels
    • Texas
    • Gillespie County
      • Fredericksburg
    • Guadalupe County
      • Seguin
    • Harris County
      • Houston
    • Hays County
      • Kyle
      • San Marcos
    • Kendall County
      • Boerne
    • McLennan County
      • Waco
    • Travis County
      • Austin
      • Lakeway
      • Pflugerville
    • Williamson County
      • Hutto
      • Cedar Park
      • Georgetown
      • Leander
      • Round Rock
      • Taylor
  • Projects
  • About
  • Resources
    • ADU Resources
    • Utilities Guide
    • Frequently Asked Questions
    • Permit Process
    • What Is an ADU?
  • Contact Us
      • Phone Consultation
      • Zoom Consultation
  • Menu Menu

Small House Solutions | ADUs

ADU Permit Cost: Build a Budget From Current City Fees

ADU permit cost is project-specific. Austin’s residential chart effective October 1, 2026 lists a $112.76 application-processing fee and a $986.15 new-construction plan-review base fee before permit, trade, utility, and other applicable charges.

Discuss your property

Couple doing finances in kitchen

Review the room layout and exterior elevations together.

Start here

Identify the correct city or county and current fee schedule.

Investigate

Separate plan preparation and engineering from government fees.

Compare early

Allow for resubmittal or utility work rather than quoting one universal total.

On this page7 sections to exploreShowHide
  1. 01Read the current fee category and effective date→
  2. 02Use the base figures without mistaking them for a total→
  3. 03Austin published residential review fees, effective October 1, 2026→
  4. 04Government charges and application services buy different work→
  5. 05Build a fee worksheet that survives a design revision→
  6. 06Related planning decisions→
  7. 07Homeowner questions→

Read the current fee category and effective date

The City chart was updated October 14, 2026 and labels these as one- and two-family residential review fees. Ask the City which review class, area tier, structures, units, and additional reviews apply to the actual ADU proposal. A designer’s permit package, survey, engineering, and application coordination remain separate professional services. San Antonio has a different fee and review system; do not transfer Austin amounts to another jurisdiction.

Ask whether area, structures, reviews, revisions, or separate permits affect the calculation. Where a charge depends on information not yet fixed, explain the dependency in the worksheet. This is more useful than a single number with no assumptions. The owner can see which design decision or authority response would make the allowance more definite and can update the record without confusing a preliminary calculation with a final invoice.

Two surveyors looking up from blueprints

Establish the site information needed before fixing the building position.

Use the base figures without mistaking them for a total

The two listed base lines add to $1,098.91 if both apply, but that is not the complete ADU permit cost. Building and trade permits, utility matters, site-specific reviews, and revisions may add charges. The chart also lists $585.77 for a residential plan-review resubmittal; ask whether it applies rather than automatically adding it. Request a project-specific fee calculation and keep a dated worksheet with actual invoiced amounts.

Record when a payment is expected and who is responsible for tracking it. A project can have an understandable total owner budget while still requiring payments at several milestones. Ask how the provider communicates new invoices and approval conditions. Keeping the sequence visible helps avoid the mistaken assumption that paying an early review amount means every permit is active or every project-related charge has already been settled.

Contractor and client at construction site

Discuss the household brief and unresolved scope before committing to construction.

Austin published residential review fees, effective October 1, 2026

Chart item Published amount Boundary
Application processing $112.76 Confirm applicability to the submission
New-construction review base $986.15 Area, unit, structure, or review adjustments may apply
Plan-review resubmittal $585.77 Not automatically charged on every project

Government charges and application services buy different work

A government review fee pays for an authority’s stated process. Drawings, survey information, engineering, application preparation, and coordination are professional services supporting the proposal. A contractor can include both in an offer, but combining them into one unexplained permit allowance prevents the owner from seeing what is funded.

The payment boundary matters. Some charges may be paid directly by the owner; other amounts may be carried in a provider’s agreement. A provisional allowance is different from an invoiced or confirmed charge. Recording the category, payer, date, and basis makes those distinctions reviewable without implying that every possible charge applies to the project.

A design revision can change the preparation work and the authority calculation independently. Additional professional coordination may be needed even when a cited base line remains unchanged. The revised proposal should identify what replaces an earlier allowance and what is genuinely additional. Keeping that change history makes the owner budget intelligible and avoids paying or budgeting for the same stated package twice.

Portrait of a Mature Woman Calculating Her Home Finances

Define the project scope and financial questions before comparing funding or estimates.

Build a fee worksheet that survives a design revision

Use separate rows for government review charges, other authority or provider charges, and professional preparation services. For each row, record the source, effective date, calculation basis, payer, and whether applicability has been confirmed. This is a worksheet structure, not a statement that every listed category applies to every ADU.

When the footprint, facilities, or project pathway changes, revisit the affected rows. Keep the previous version so the owner can see why an allowance moved. Do not add a revised fee to an obsolete allowance without checking whether it replaces that allowance or represents additional work. The same discipline applies when a provider’s proposal changes from preliminary to defined scope.

Give the owner a subtotal of confirmed items and a visible list of unresolved items. The unresolved list is part of the budget discussion, not a reason to present a falsely precise all-in figure. Ask the responsible coordinator what information will close each question. This approach makes the cited Austin base lines useful while preventing their arithmetic subtotal from becoming an unsupported permit budget.

Related planning decisions

Choose the next topic that helps you move your project forward.

  • Permit guideUnderstand the ADU permit processReview the Austin permit pathway and questions for your project team.Explore topic→
  • ServicesADU planning & constructionExplore property, design and construction considerations for an ADU.Explore topic→
  • Project examplesExplore completed projectsReview the documented scope of published Small House Solutions projects.Explore topic→

More planning guides

  • Planning guideADU Feasibility Reports: Deliverables to Review Before DesignAn ADU feasibility report should explain the findings, open questions, and next decisions for one property. Review the evidence behind a go, revise, or stop recommendation before paying…Read the guide →

Homeowner questions

Is $1,098.91 the all-in ADU permit cost?

No. It is only the arithmetic sum of the two cited base review lines if applicable. Ask for building, trade, utility, and other project-specific charges before setting the complete approval budget.

How should I record an allowance that has not been confirmed?

Label it provisional, identify its basis, and state who will confirm applicability and amount. Keep it separate from paid or confirmed charges. A dated allowance is a planning input; it should not appear as a final government invoice or a complete approval budget.

Can I use Austin’s fee subtotal in another city?

No. Use the other authority’s current categories and confirm applicability to the actual proposal. A dated Austin subtotal can explain budgeting structure, but it does not establish another jurisdiction’s charges, professional-service costs, utility payments, or complete approval-related expenditure.

Plan the next step for your property

Share your property address and what the space needs to do. Ask Small House Solutions about site feasibility, current service fit, and a defined next step.

Discuss your project

Small House Solutions' Stacked Tag Color
© 2026 Small House Solutions, LLC. Texas custom design-build homes, ADUs, additions, and remodels. - Enfold Theme by Kriesi
  • Link to Facebook
  • Link to Instagram
  • Link to Houzz
  • Link to X
Link to: Kitchen Addition Cost: Separate the Expansion From the Kitchen Fit-Out Link to: Kitchen Addition Cost: Separate the Expansion From the Kitchen Fit-Out Kitchen Addition Cost: Separate the Expansion From the Kitchen Fit-OutModern style kitchen interior Link to: Mother-in-Law Suite Addition Cost: Budget for Independence Link to: Mother-in-Law Suite Addition Cost: Budget for Independence Modern style bedroom interiorMother-in-Law Suite Addition Cost: Budget for Independence
Scroll to top Scroll to top Scroll to top
Small House Solutions logo

Free project-fit consultation

Talk through your small home or ADU project.

Get clear next steps on project fit, budget range, site questions, and whether Small House Solutions is the right design-build partner for your property.

ADUs
Custom homes
Additions
Remodels
Schedule a Phone ConsultationBest first step
Schedule a Zoom ConsultationScreen share or remote planning

Choose the option that is easiest for you. Either consultation can help confirm whether your scope and budget are aligned before deeper planning begins.

Before you book

Know the likely investment range.

Small House Solutions is a custom design-build firm, not a low-budget builder. Typical project contracts range from $240 to $500+ per square foot, with cost often decreasing as square footage increases.

  • $150,000 minimum construction contract pricing for most projects.
  • Accessory structures with no plumbing, such as a backyard office, may be an exception.
  • If the budget does not fit the scope, the team may follow up by email instead of holding the consultation.

Ready to compare your idea against the real numbers? Pick a consultation type and bring your address, rough budget, desired size, and timeline.

Small House Solutoin logo

Initiating Contact With Small House Solutions

As you prepare for this project, please bear in mind that “small” does not equal “cheap”. We are not a low-budget builder.

Schedule a Phone Consultation
Schedule a Phone Consultation

 

Our project contracts range from $240 to $500+ per square foot, with cost decreasing as square footage increases. Due to current market conditions, we cannot offer construction contract pricing under $150,000, with the exception being accessory structures with no plumbing (i.e.: backyard office). If your specified budget is not realistic for your project, we will respectfully cancel your consultation with an email response as to why.

We look forward to speaking with you.