ADU Permit Cost: Build a Budget From Current City Fees
ADU permit cost is project-specific. Austin’s residential chart effective October 1, 2026 lists a $112.76 application-processing fee and a $986.15 new-construction plan-review base fee before permit, trade, utility, and other applicable charges.
Review the room layout and exterior elevations together.
Identify the correct city or county and current fee schedule.
Separate plan preparation and engineering from government fees.
Allow for resubmittal or utility work rather than quoting one universal total.
Read the current fee category and effective date
The City chart was updated October 14, 2026 and labels these as one- and two-family residential review fees. Ask the City which review class, area tier, structures, units, and additional reviews apply to the actual ADU proposal. A designer’s permit package, survey, engineering, and application coordination remain separate professional services. San Antonio has a different fee and review system; do not transfer Austin amounts to another jurisdiction.
Ask whether area, structures, reviews, revisions, or separate permits affect the calculation. Where a charge depends on information not yet fixed, explain the dependency in the worksheet. This is more useful than a single number with no assumptions. The owner can see which design decision or authority response would make the allowance more definite and can update the record without confusing a preliminary calculation with a final invoice.
Establish the site information needed before fixing the building position.
Use the base figures without mistaking them for a total
The two listed base lines add to $1,098.91 if both apply, but that is not the complete ADU permit cost. Building and trade permits, utility matters, site-specific reviews, and revisions may add charges. The chart also lists $585.77 for a residential plan-review resubmittal; ask whether it applies rather than automatically adding it. Request a project-specific fee calculation and keep a dated worksheet with actual invoiced amounts.
Record when a payment is expected and who is responsible for tracking it. A project can have an understandable total owner budget while still requiring payments at several milestones. Ask how the provider communicates new invoices and approval conditions. Keeping the sequence visible helps avoid the mistaken assumption that paying an early review amount means every permit is active or every project-related charge has already been settled.
Discuss the household brief and unresolved scope before committing to construction.
Austin published residential review fees, effective October 1, 2026
| Chart item | Published amount | Boundary |
|---|---|---|
| Application processing | $112.76 | Confirm applicability to the submission |
| New-construction review base | $986.15 | Area, unit, structure, or review adjustments may apply |
| Plan-review resubmittal | $585.77 | Not automatically charged on every project |
Government charges and application services buy different work
A government review fee pays for an authority’s stated process. Drawings, survey information, engineering, application preparation, and coordination are professional services supporting the proposal. A contractor can include both in an offer, but combining them into one unexplained permit allowance prevents the owner from seeing what is funded.
The payment boundary matters. Some charges may be paid directly by the owner; other amounts may be carried in a provider’s agreement. A provisional allowance is different from an invoiced or confirmed charge. Recording the category, payer, date, and basis makes those distinctions reviewable without implying that every possible charge applies to the project.
A design revision can change the preparation work and the authority calculation independently. Additional professional coordination may be needed even when a cited base line remains unchanged. The revised proposal should identify what replaces an earlier allowance and what is genuinely additional. Keeping that change history makes the owner budget intelligible and avoids paying or budgeting for the same stated package twice.
Define the project scope and financial questions before comparing funding or estimates.
Build a fee worksheet that survives a design revision
Use separate rows for government review charges, other authority or provider charges, and professional preparation services. For each row, record the source, effective date, calculation basis, payer, and whether applicability has been confirmed. This is a worksheet structure, not a statement that every listed category applies to every ADU.
When the footprint, facilities, or project pathway changes, revisit the affected rows. Keep the previous version so the owner can see why an allowance moved. Do not add a revised fee to an obsolete allowance without checking whether it replaces that allowance or represents additional work. The same discipline applies when a provider’s proposal changes from preliminary to defined scope.
Give the owner a subtotal of confirmed items and a visible list of unresolved items. The unresolved list is part of the budget discussion, not a reason to present a falsely precise all-in figure. Ask the responsible coordinator what information will close each question. This approach makes the cited Austin base lines useful while preventing their arithmetic subtotal from becoming an unsupported permit budget.
Related planning decisions
More planning guides
Homeowner questions
Is $1,098.91 the all-in ADU permit cost?
No. It is only the arithmetic sum of the two cited base review lines if applicable. Ask for building, trade, utility, and other project-specific charges before setting the complete approval budget.
How should I record an allowance that has not been confirmed?
Label it provisional, identify its basis, and state who will confirm applicability and amount. Keep it separate from paid or confirmed charges. A dated allowance is a planning input; it should not appear as a final government invoice or a complete approval budget.
Can I use Austin’s fee subtotal in another city?
No. Use the other authority’s current categories and confirm applicability to the actual proposal. A dated Austin subtotal can explain budgeting structure, but it does not establish another jurisdiction’s charges, professional-service costs, utility payments, or complete approval-related expenditure.