Small House Solutions l Design-Build in Texas
  • Home
  • ADUs
    • ADU Feasibility
    • ADU Cost
    • ADU Utilities
    • ADU Projects
    • Austin ADU Regulations
    • Permit Process
    • Our ADU Process
  • LOCATIONS
    • Bastrop County
    • Bell County
      • Copperas Cove
      • Harker Heights
      • Killeen
    • Bexar County
      • Cibolo
      • Converse
      • Leon Valley
      • Live Oak
      • San Antonio
      • Schertz
      • Universal City
    • Blanco County
    • Burnet County
      • Marble Falls
    • Caldwell County
      • Lockhart
    • Comal County
      • New Braunfels
    • Texas
    • Gillespie County
      • Fredericksburg
    • Guadalupe County
      • Seguin
    • Harris County
      • Houston
    • Hays County
      • Kyle
      • San Marcos
    • Kendall County
      • Boerne
    • McLennan County
      • Waco
    • Travis County
      • Austin
      • Lakeway
      • Pflugerville
    • Williamson County
      • Hutto
      • Cedar Park
      • Georgetown
      • Leander
      • Round Rock
      • Taylor
  • Projects
  • About
  • Resources
    • ADU Resources
    • Utilities Guide
    • Frequently Asked Questions
    • Permit Process
    • What Is an ADU?
  • Contact Us
      • Phone Consultation
      • Zoom Consultation
  • Menu Menu

Small House Solutions | ADUs

ADU Remodeling: Update the Home Without Hiding Existing Problems

ADU remodeling should begin with its approved use and existing systems, then distinguish cosmetic improvements from work that changes layout, structure, utilities, or occupancy.

Discuss your property

Man painting, renovating house

Assess the existing rooms, connections and remaining construction work before selecting finishes.

Start here

Record the existing permit status and what was actually approved.

Investigate

Check the condition and capacity of electrical, water, wastewater, and HVAC systems.

Compare early

Focus on changes that improve daily use without hiding structural or moisture problems.

On this page8 sections to exploreShowHide
  1. 01Start with the legal and physical baseline→
  2. 02Remodel around the resident’s daily friction→
  3. 03Separate the remodeling scopes→
  4. 04Retention is a scope decision, not just a condition decision→
  5. 05Plan the temporary living arrangement→
  6. 06Compare a kitchen refresh with a circulation repair→
  7. 07Related planning decisions→
  8. 08Homeowner questions→

Start with the legal and physical baseline

Collect permit history, approved plans when available, and final inspection records. Compare the records with the actual rooms and service connections. A room marketed as an ADU may not have been approved as a dwelling. Then inspect roof and wall water intrusion, slab or foundation movement, electrical capacity, plumbing condition, and ventilation before choosing cabinetry or flooring.

Mark each existing element as retain, repair, replace, or investigate on the measured plan. A cabinet may remain while adjacent flooring needs replacement; a usable fixture may still need temporary removal to reach a repair. These distinctions make a finish-focused brief more accurate. They also protect the parts of the ADU the resident values, instead of allowing an undefined remodel to replace useful work while leaving the original fault unresolved behind new surfaces.

Remodel around the resident’s daily friction

Focus on the problems the resident experiences: a kitchen without landing space, a bath door that blocks movement, inaccessible storage, or a dark living area. Keeping wet areas near existing services may reduce disruption, but only if the original installation is suitable. For occupied ADUs, agree on temporary kitchen, bathroom, utility shutdowns, and access during work.

Separate the remodeling scopes

Scope Typical decision Required investigation
Cosmetic Paint, hardware, replaceable finishes Surface and moisture condition
Layout Move partitions or kitchen Structure and service routes
Use change Create an independent dwelling Local classification and approvals

Retention is a scope decision, not just a condition decision

An existing component can be sound yet poorly suited to the remodel. A cabinet may remain usable while preventing the appliance arrangement that would improve circulation. Conversely, replacing every cabinet may add little benefit if the real problem is a doorway or an unresolved service condition. Retention should be evaluated against both condition and the intended room function.

A keep, repair, relocate, or replace schedule makes these choices visible. Each category has a different scope: keeping a component can still require protection and finish work around it; relocation can affect services and neighboring surfaces; replacement includes removal as well as the new product. The schedule helps distinguish those packages without assuming a universal saving for reuse.

In a compact ADU, changes also compete for limited wall and floor space. A relocated appliance can improve the main route but remove useful storage; a larger bathroom can reduce shared living. The preferred arrangement should preserve the functions that matter to the resident across the whole dwelling. Existing records and condition findings remain part of the decision, especially where a proposed finish improvement could conceal a discrepancy or a repair that still needs resolution.

Living room with floor cushions beside a stone fireplace

Keep seating, daylight and the main walking route in the same layout study.

Plan the temporary living arrangement

An ADU remodel can affect the only kitchen or bathroom available to its resident. Before agreeing a construction sequence, discuss whether the unit can remain occupied and what happens when services are interrupted. Identify access, stored belongings, deliveries, pets, and the boundary between construction and occupied areas. The arrangement should fit the actual scope rather than a generic promise of minor disruption.

Discuss the same issue with the main-house household. Contractors may need a route through shared outdoor space or access to equipment serving both buildings. Record expected interruptions and who communicates them. A useful plan identifies the decisions required before the next stage begins and explains what would trigger a revised occupancy arrangement. This helps residents understand the practical effect of a scope change before walls or fixtures are removed.

Woman painting wall of new home

Review the room layout and exterior elevations together.

Compare a kitchen refresh with a circulation repair

Imagine an occupied ADU where a refrigerator door blocks the path between the entry and bathroom. New cabinet fronts may improve appearance while preserving that conflict. Compare a finish refresh, a changed appliance arrangement, and a broader layout revision before choosing the remodeling package. These are conceptual scopes, not priced projects.

Draw doors and drawers open and place the resident’s dining chair, laundry basket, and everyday storage on the plan. Trace a person entering with groceries while another uses the kitchen. Identify whether the conflict comes from the appliance position, insufficient storage, or a route crossing the work area. Each cause suggests a different intervention.

Then connect the preferred intervention to the existing-condition review. Moving an appliance can affect services, cabinetry, and adjacent finishes; retaining it may limit the improvement. Ask for those dependencies in the scope comparison. Choose the smallest coordinated change that solves the documented problem without hiding an unresolved repair. That gives the remodel a measurable functional objective beyond replacing materials and calling the ADU updated.

Plumber connecting PVC pipes

Coordinate fixture locations and pipe routes before completing the wall and room finishes.

Related planning decisions

Choose the next topic that helps you move your project forward.

  • ServicesADU planning & constructionExplore property, design and construction considerations for an ADU.Explore topic→
  • Project examplesExplore completed projectsReview the documented scope of published Small House Solutions projects.Explore topic→


Homeowner questions

Can I remodel an unpermitted ADU?

Do not assume a finish remodel resolves its status. Ask the local authority and qualified project team how existing work must be documented or corrected before new work proceeds.

Can new flooring solve a persistent damp smell?

Do not treat a surface replacement as diagnosis. Have the source of moisture or odor investigated and address the relevant cause before concealing the area. Ask how the repair and the proposed floor assembly will be coordinated with the existing building.

Can a cosmetic remodel avoid investigating earlier alterations?

A limited finish scope does not make a known discrepancy disappear. Share earlier alterations and available records with the team. Ask which conditions affect the proposed work and what verification is necessary before the design, construction scope, or approval route can be confirmed.

Plan the next step for your property

Share your property address and what the space needs to do. Ask Small House Solutions about site feasibility, current service fit, and a defined next step.

Discuss your project

Small House Solutions' Stacked Tag Color
© 2026 Small House Solutions, LLC. Texas custom design-build homes, ADUs, additions, and remodels. - Enfold Theme by Kriesi
  • Link to Facebook
  • Link to Instagram
  • Link to Houzz
  • Link to X
Link to: ADU Feasibility Reports: Deliverables to Review Before Design Link to: ADU Feasibility Reports: Deliverables to Review Before Design ADU Feasibility Reports: Deliverables to Review Before DesignSurveyor at construction site Link to: Garage Apartment Builders: Above-Garage and Conversion Choices Link to: Garage Apartment Builders: Above-Garage and Conversion Choices Garage facades with contrasting black cladding and turquoise trimGarage Apartment Builders: Above-Garage and Conversion Choices
Scroll to top Scroll to top Scroll to top
Small House Solutions logo

Free project-fit consultation

Talk through your small home or ADU project.

Get clear next steps on project fit, budget range, site questions, and whether Small House Solutions is the right design-build partner for your property.

ADUs
Custom homes
Additions
Remodels
Schedule a Phone ConsultationBest first step
Schedule a Zoom ConsultationScreen share or remote planning

Choose the option that is easiest for you. Either consultation can help confirm whether your scope and budget are aligned before deeper planning begins.

Before you book

Know the likely investment range.

Small House Solutions is a custom design-build firm, not a low-budget builder. Typical project contracts range from $240 to $500+ per square foot, with cost often decreasing as square footage increases.

  • $150,000 minimum construction contract pricing for most projects.
  • Accessory structures with no plumbing, such as a backyard office, may be an exception.
  • If the budget does not fit the scope, the team may follow up by email instead of holding the consultation.

Ready to compare your idea against the real numbers? Pick a consultation type and bring your address, rough budget, desired size, and timeline.

Small House Solutoin logo

Initiating Contact With Small House Solutions

As you prepare for this project, please bear in mind that “small” does not equal “cheap”. We are not a low-budget builder.

Schedule a Phone Consultation
Schedule a Phone Consultation

 

Our project contracts range from $240 to $500+ per square foot, with cost decreasing as square footage increases. Due to current market conditions, we cannot offer construction contract pricing under $150,000, with the exception being accessory structures with no plumbing (i.e.: backyard office). If your specified budget is not realistic for your project, we will respectfully cancel your consultation with an email response as to why.

We look forward to speaking with you.